S.N Name of Project Client Description of Project Rendered Value of Work Project Period Remarks
1. Socio-Economic Impact Trail Suspension Bridges (EC No. 2 ) USAID/Nepal Socio-Economic impact study of 13 USAID financed Trail Suspension Bridges. NRs. 0.88 million Jul.1977 –
Jun. 1978
Single
2. Phalankhu River Bridge (EC No. 4) Royal Nepal Army Construction Supervision of highway bridge over Phalankhu River at Betrawati. NRs. 0.21 million Jun. 1979-
Oct. 1980
Single
3. Priority Ranking of Suspension Bridges
(EC No. 5)
USAID/Nepal Trail Socio-Economic site survey and Priority ranking of 10 trail suspension bridges, preparation of bilingual manual for site survey procedures. NRs. 0.48 million Jan. 1980–
Nov 1980
Single
4. Evaluation of Trail Suspension Bridge Project (EC No. 38) USAID/Nepal Final Evaluation of the Trail Suspension Bridge Project. NRs. 0.35 million Aug. 1983-
Dec. 1983
Single
5. Dhadhing Bridge Building Local Level (An Action Program)
(EC No. 92)
HELVETAS Implementation, Process Monitoring of a Pilot Project for the development of Dhadhing district local bridge building needs that may eventually contribute to a district wide community bridge building plan. NRs. 0.675 million Jan. 1990-
Aug. 1992
Single
6. Inventory Study of Trail Bridges in Bhutan
(EC No. 94)
Helvetas/ Department of Works & Housing, Royal Government of Bhutan Inventory study of 55 and 98 Trail bridges all over the country. NRs. 0.028 million (Phase I)
NRs. 0.02 million (Phase II)
Sept. 1991-Feb. 1992 (Phase I) &
Oct.1992-Apr. 1993
(Phase II)
Single
7. Intermediate Trail Bridge Handbook (ITBH)
(EC No. 119)
Helvetas/Nepal Development of an Intermediate Trail Bridge Handbook on intermediate bridge building technology which will serve as a reference and guidelines for the survey, design and construction of local bridges by the District Authorities which can be effectively used by local artisans and technicians at village and district level. NRs. 0.7 million May 1993 –
Nov. 1993.
Single
8. Duwadi Ghat Suspended Bridge Project
(EC No. 122)
GTZ/GDP To provide management support, construction supervision & approach development for the construction of 185m long pedestrian trail suspended bridge through participatory approach at Duwadi Ghat across the Trishuli River. Nov. 1993 –
Oct. 1994
Single
9. Survey, Design & Cost Estimate of Phisling Trail Bridge (EC No. 125) SAPPROS Nepal To undertake the Survey, Design and Cost Estimate work of suspension trail bridge in Trishuli River located in Phisling Bazaar. Nov. 1993-
Aug. 1994
Single
10. Construction Supervision of Phisling Trail Bridge
(EC No. 131)
SAPPROS – Nepal Technical Supervision of Construction of a Trail Bridge at Phisling across Trishuli River. Mar.199-Nov. 1994 Single
11. Bridges & Hospital Project (EC No. 139) PLAN International Detailed Engineering Design of 10m Span RCC bridges in 3 Rivers and Children Ward at Koshi Hospital including construction supervision. NRs. 0.4 million Feb. 1995 –
Oct. 1998
Single
12. Rangrung Suspension Bridge Project
(EC No. 144)
SAPPROS Technical Assistance Support Services for the Construction of 43m Span Suspension Bridge in Gorkha District. NRs. 0.175 million Apr. – Aug. 1995 Single
13. Bridge Projects
(EC No. 212)
DOR Detailed Engineering Survey, Soil Investigation and Detailed Design of the bridges in: (i) Chipleti River at Chitwan; (ii) Andhi (Syangja Bazar) River at Syangja; (iii) Banjariya River Banjariya VDC at Rupandehi District. NRs. 0.592 Million Mar.28-
Jul.4, 2000
Full Bright Consultancy (P) Ltd. (J.V.)
14. Bridge Projects
(EC No. 223)
NEPECON
  1. Detailed Engineering Survey, Soil Investigation and Detailed Design of:
  2. Bhandara River along Katari Okhaldhunga Road in Udaypur.
  3. Sunkoshi River along Katari Okhaldhunga Road in Udaypur.
NRs. 0.878Million Aug. 28, 2000 –
Jan. 11, 2001
Single
15. Sorakhutte to JICA Bridge Sector
(EC No. 227)
DUDBC/BLRP Detailed Design NRs. 0.098 Million Nov.16–
Dec. 20, 2000
Single
16. Tinpiple-Bancharedanda Okharpauwa Landfill Site Development Project
(EC No. 237)
MOLD/
SWM&RMC
Construction Supervision of Landfill Site Access Road and Bridge. NRs. 3.87 million May 1, 2001 – Jun.30, 2002 Single
17. Bridges Project
(EC No. 243)
MOPP&W/DOR Detailed Engineering Survey, Soil Investigation, Hydrological Analysis and Detailed Design of (1) Jhupa Khola in Surkhet District; (2) Kailash River in Achham District; and (3) Igadi Gad River along Sanfe-Martadi Road in Bajura District. NRs. 1.11 million Apr.29-Jul.7, 2001 J.V. Full Brightb
18. Bridge Projects
(EC No. 126)
SWM&RMC Construction Supervision of Kolpu-II Bridge. NRs. 0.366 million Aug. 8, 2002 –
Jan. 14, 2004
Single
19. Sindhu River Project
(Project No. 412)
Melamchi Water Supply Development Board Feasibility Study of Bridge Across Sindhu River Project NRs. 0.135 million Feb. 18 – Apr. 3, 2007 Single
20. Construction Supervision Bagmati River Bridge at Sundarijal Audit Access Road Project
(Project No. 421)
Melamchi Water Supply Development Construction Supervision NRs. 0.144 million Feb. – May , 2008 Single
21. Feasibility Study and Detailed Design of Madi Khola Bridge on Liwang Ghartigaun Road in Rolpa District
(Project No. 423)
DOR/MWDRO, Pyuthan • Feasibility Study;
• Detailed Engineering Survey;
• Soil Investigation;
• Hydrological Study; and
• Detailed design of Madi Khola Bridge
NRs. 0.442 million March 5 – May 13, 2008 Single
22. Investigation and Detailed Design of Bridge across Sindhu Khola along Sankhu Kaule Road Melamchi Water Supply Development Board Detailed design of Sindhu Khola Bridge NRs. 0.388 million May 4 –Sept., 2008 Single
23. Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Bridge(s) Project. Department of Roads, Planning and Design Branch, Bridge Unit, Babar Mahal, Kathmandu Consulting Services for Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Bridge(s) NRs. 3.590 million July 11, 2007 – Feb 6, 2009 Single
24. Detailed Engineering Design of Rahughat Bridge Project Development Department, Engineering Services NEA, Ratna Park Detailed Engineering Design of Rahughat Bridge NRs. 0.288 million March – June , 2009 Single
25. Detailed Engineering Design of Devighat Bridge over Penstock Project Development Department, Engineering Services NEA, Ratna Park Detailed Engineering Design of Devighat Bridge over Penstock NRs. 0.285 million June – July 2009 Single
26. Feasibility Study, Detailed Engineering Survey, Hydrological Study and Detailed Design of Dhaman Khola Bridge. Ministry of Physical Planning and Works, Sunsari Morang Bridge Construction Project, Ithari. Feasibility Study, Detailed Engineering Survey, Hydrological Study and Detailed Design. NRs. 0.126 million Jan. 20 – Feb., 2009 Single
27. Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Bridge(s) Package 23. Department of Roads, Planning and Design Branch, Bridge Unit, Babar Mahal, Kathmandu Consulting Services for Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Bridge(s) Package 23. NRs. 5.920 million June 2009 – Jan 2010 Single
28. Construction Supervision, Quality Control and Other Technical Support for Motorable Bridge over Shani Bheri at Phalamegaunda, Rukum District DOLIDAR, Lalitpur Construction Supervision, Quality Control and Other Technical Support for Motorable Bridge over Shani Bheri at Phalamegaunda, Rukum District NRs. 4.713 million Nov. 2009 – March 2010 Single
29. Detailed Engineering Design of a Permanent RCC Road Bridge over Tamor River Project Development Department, Engineering Services NEA, Ratna Park Detailed Engineering Design of a Permanent RCC Road Bridge over Tamor River NRs. 0.663 million Feb 2010 – Aug. 2010 Single
30. Topographic Survey, Hydrologial Study and Preliminary Design of Bridges (Shikaribas Bridge & Thutekhola Bridge along Birgunj – Thori Road, Parsa) Department of Roads, Hulaki Rajmarga Bridge Project Topographic Survey, Hydrologial Study and Preliminary Design of Bridges (Shikaribas Bridge & Thutekhola Bridge along Birgunj – Thori Road, Parsa) NRs. 0.10 million Dec 2009 – June 2010 Single
31. Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Banjijare Khola Bridge, Contract No. BP-DSD (Madhya)-02-/066/67 Department of Roads Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Banjijare Khola Bridge NRs. 0.558 million April 2010 – May 2010 Single
32. Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Bakshu Khola Bridge, Contract No. BP-DSD (Madhya) – 05 – /066/67 Department of Roads Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Bridge NRs. 0.476 million April 2010 – May 2010 Single
33. Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Bheri Nadi Bridge, Contract No. BP-DSD (Madhya) – 14 -/066/67 Department of Roads Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Bridge NRs.0.573 million April 2010 – May 2010 Single

.